Sunday 12 February 2012

UNDERPINNING INVESTIGATION.

I was concerned that if i demolished the existing vestibule - would the main front wall of the Chapel be supported. I was hoping that the main front wall of the Chapel had a foundation or was built off rock. The existing Chapel ground floor level is approximately 2.5m above the road level. I had to potentially excavate down to the road level to investigate the wall construction.






No comments:

Post a Comment