Amroth Project
A diary of the regeneration of Ebenezer church in Amroth.
Tuesday, 8 May 2012
RETAINING WALL BASE REINFORCEMENT PROGRESS.
A393 mesh top and bottom.
Base a minimum of 300mm thick concrete.
500mm minimum below finished floor level.
Mains water connection ducted through foundation.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment