Monday, 11 June 2012
FRONT RIGHT HAND SIDE WALL RE-BUILD.
End bearing for the two steel beams.
Concrete pad foundation 1m x 1m at a depth of 600mm on solid clay.
Two 203mm x 203mm x 46Kg/m UC's spanning 4.7m.
Concrete poured around steel beams.
720mm x 350mm ground beam.
Grade 30 concrete with 75mm cover to steel sections.
Wednesday, 6 June 2012
FILLING THE VOID BEHIND THE RETAINING WALL.
Building up the level's to get the correct fall for the land drain.
The land drain is going to go around the back of the retaining wall and fall towards the road.
The 100mm land drain is visible on the left hand side.