Monday, 11 June 2012

FRONT RIGHT HAND SIDE WALL RE-BUILD.











End bearing for the two steel beams.


Concrete pad foundation 1m x 1m at a depth of  600mm on solid clay.





























Two 203mm x 203mm x 46Kg/m UC's spanning 4.7m. 








Concrete poured around steel beams.
720mm x 350mm ground beam.
Grade 30 concrete with 75mm cover to steel sections. 


No comments:

Post a Comment